1:1 model of bamboo ceiling and frame construction 10/2005 |
|
|
|
The biggest challenge so far: the first floor construction. The bamboo poles sourced locally are thinner than expected and not straight. As a result modifications to the planned construction had to be made. Together with our local bamboo workers we built a second 1:1 model and tested it with the maximum load…<| |
|
|
|
|